6.8 KiB
6.8 KiB
Address, Type
| Address | Type |
|---|---|
| 220 Emerald | Primary Residence |
🏠 220 Emerald Maintenance Log
This document tracks maintenance and supplies for the home at 220 Emerald.
Church Use — Elders Meeting 2026-07-21
Captured 2026-07-23. Full notes in journals/2026-07-22 and projects/220_emerald_church_hosting_preparation_2026.md
- Property: main house church room extension + little house + barn
- Purchase: Alicia spotted, bought on faith while church was looking for space, barn seen as provision; previous home paid off/rented, new mortgage higher but covered
- Barn for Sunday services: consensus NO for now — residential zoning needs public-gathering permit/rezoning (Alberto noted left 3rd St over same), noise/neighbor concern
- $30k insulation/restroom estimate: Ap. David Clemetson questioned as not justified short-term (possible move 6-12 mo); suggested low-cost residential uses: worship practice partitioned, recording space, hangout/coffee bar for small gatherings/intercession; questioned fans vs extractor, pro source
- Adolfo requests (comfort/upkeep): fans (heat/mosquitoes Sat prayer), consistent cleaning, drinking water, toiletries, bathroom logistics (only 1 far), belongings guidance, more communication/inclusion; asked about summer prayer in cooler church room — elders avoided to protect family space
- Tone: David Hewitt apologized for expenses/communication; Ap. David said not personal failure, gap was communication; deep appreciation
- Open: 4 ceiling fans under discussion, central AC ~$7200 quote (Alberto 2nd estimate), mini-split extension may not be needed after central, barn on little house meter 220 service, Adolfo to be included in future planning, long-term leaning community-engaging location
💧 Water Filtration System
- Peroxide & Salt Pellets
- Last Service: 2026-07-16 (Added 10 bottles peroxide and 2 bags salt pellets)
- Check Cycle: Monthly (Avg. refill every 1.5 months)
- Next Check Due: 2026-08-16
- Current Status: Replenished on 2026-07-16 with usual amount: 10 bottles peroxide and 2 bags salt pellets.
- Next Action: Check peroxide and salt pellet levels around 2026-08-16.
- Service History:
- 2026-07-16: Added usual amount to water filtration system — 10 bottles peroxide and 2 bags salt pellets.
- 2026-06-05: Added 10 bottles peroxide and 2 bags salt pellets.
- 2026-04-26: Added 2 bags salt pellets; peroxide purchase pending.
- 2026-04-25: Family noted this as the relevant date for the 90-day/3-month follow-up reminder.
🚰 Drinking Water Filter — 4 Stage Residential RO
- Discovered: 2026-07-13 from manual photo (Page 11 of 12 - 4 STAGE USER MANUAL)
- Type: 4 Stage Reverse Osmosis Drinking Water System (under kitchen sink)
- Flow: Cold water → Angle Stop Adaptor (HDFS-ASVA-14) → Sediment (SOC-25-1005) → Carbon Block (CB-25-1005) → Automatic Shut-off Valve (ASV-14QW) → Membrane Housing (MH03-1812WH) with Flow Restrictor FR-550QC → Post Carbon ICF-10Q → Tank RO-4S-W14 (4.5 gal white) + RO Faucet LF-LR-5TND → To Faucet / To Drain via Saddle DS-14QC
- Manual Photo:
attachments/ro_system_manual_page11_2026-07-13.jpg - Replacement Cycle:
- Stage 1 Sediment + Stage 2 Carbon Block: every 6-12 months
- Stage 4 Post Carbon (ICF-10Q): every 12 months / 2000 gal
- Stage 3 Membrane 50 GPD (TW-1812-50): every 2-3 years
- Last Service: (Pending - unknown, log when replaced)
- Next Check Due: ASAP - check last change date, overdue if >12 months on Stage 1+2
- Filters to Buy (exact part numbers from manual):
- Stage 1:
SOC-25-1005— Hydronix NSF Sediment Filter 2.5" X 9.75" 5 micron — QTY 1 - Stage 2:
CB-25-1005— Hydronix NSF Carbon Block Filter 2.5" X 9.75" 5 micron — QTY 1 - Stage 3:
TW-1812-50— Hydronix NSF TFC 50 GPD Membrane Dry — QTY 1 (upgrade option: TW-1812-75 = 75 GPD, same housing) - Stage 4:
ICF-10Q— Hydronix Inline Coconut Filter 2000 Gal, 2" x 10", 1/4" Quick Connect — QTY 1
- Stage 1:
- Kit Search:
SOC-25-1005 CB-25-1005 ICF-10Q TW-1812-50— 4-pack kit ~$45-65 on Amazon - Compatible Generic Spec: 2.5"x9.75" 5mic sediment + 2.5"x9.75" 5mic carbon block + 2"x10" inline post QC + 1812-50 membrane
- Hardware (do NOT replace routinely):
HF2-10WHWH14Housing 10" white 1/4" QTY 2,RO-4S-W14Tank 4.5G,LF-LR-5TNDFaucet chrome,DS-14QCDrain saddle,ASV-14QWAuto shut-off,FM-60WBracket triple,CLP-25WClip 2.5" QTY 2,CLP-2520WDouble clip QTY 2,MH03-1812WHMembrane Housing,FR-550QCFlow restrictor 550ml/min 90gpd,HDFS-ASVA-14Angle stop adaptor,HDF-ASVA-14Tube elbow,HDF-FE0602Elbow QTY 2,HDF-FE0404Check valve,HDF-BVTD0404Tank ball valve
🔥 Boiler Filter
- Last Service: (Pending)
- Check Cycle: (Pending)
🏠 Main House — New AC Quote (2026-06-09)
- Date: 2026-06-09
- Vendor: Twin Cooling, Inc — Lic # CAC1816204 — 5901 Palm Dr, Fort Pierce, FL 34982 — 772-240-3736 / 561-277-5458
- Proposal For: Adolpho — 770 Emerald Ave, Fort Pierce, FL (Note: Emerald listed as 770, likely typo for 220 Emerald Ave — verify) — Phone 347-331-9479
- System Specs:
- Tonnage: 5 TON 10KW (electric heat)
- SEER: 15
- Manufacturer: GrandAire (budget Goodman subsidiary)
- Condenser: WSA5S60
- Air Handler: WCHL 60
- Pricing:
- Total: $7,200
- Discount: —
- Rebate: —
- Final Investment: $7,200
- Down / Balance: —
- Warranty:
- Labor: 1 year
- Parts: 10 years
- Compressor: 10 years
- Condenser Coil: 10 years
- Evaporator Coil: 10 years
- Included? Checklist: All piping / air distribution / control / electrical / filter items unchecked on form — confirm what is included in $7200 (new lines? permit? disposal? thermostat? slab?)
- Quote Photo:
attachments/ac_quote_twin_cooling_7200_2026-06-09.jpg - Status: Proposal received, not yet signed (customer signature blank)
- Next Action: Confirm scope (lineset, drain, permit, thermostat, crane, slab, disposal included?) and compare with 2-3 other quotes per project
220_emerald_church_hosting_preparation_2026.md
🏠 Guest House
- AC Unit
- Last Service: 2026-02-23 (Twin Cooling, Inc. fixed AC unit; invoice total $778)
- Check Cycle: (Pending)
- Service History:
- 2026-02-23: Twin Cooling, Inc. service invoice for guest house AC at 220 Emerald Ave. Work description handwritten and partially unclear; invoice lists duct/refrigerant/tax and total $778. Company contact on invoice: 772-461-8736 / 561-727-5458. Communication number used: +1 (772) 240-3736.
🚗 Car Service
- Corolla 2024
- Last Service: (Pending)
- Status: Scheduled (Scheduled by Adolfo on 2026-04-07)
- Infinity QX60 2017
- Last Service: 2026-04-15 (Oil Change & Rotation completed)
- Status: Completed (Service finalized on 2026-04-15)