Files
FamReynaBrain/areas/maintenance/220_emerald.md
T
aeroreyna 922a91fa84 Add 4-stage RO drinking filter system from manual Page 11 — 2026-07-13
- SOC-25-1005 sediment, CB-25-1005 carbon block, TW-1812-50 membrane 50GPD, ICF-10Q post inline
- Add flow diagram notes, replacement cycles, kit search, manual photo
2026-07-13 18:21:04 -04:00

3.9 KiB

Address, Type
Address Type
220 Emerald Primary Residence

🏠 220 Emerald Maintenance Log

This document tracks maintenance and supplies for the home at 220 Emerald.

💧 Water Filtration System

  • Peroxide & Salt Pellets
    • Last Service: 2026-06-05 (Added 10 bottles peroxide and 2 bags salt pellets)
    • Check Cycle: Monthly (Avg. refill every 1.5 months)
    • Next Check Due: 2026-07-25
    • Current Status: Replenished on 2026-06-05; family later noted April 25 as the relevant date for the 90-day follow-up cadence.
    • Next Action: Check peroxide and salt pellet levels around 2026-07-25
    • Service History:
      • 2026-06-05: Added 10 bottles peroxide and 2 bags salt pellets.
      • 2026-04-26: Added 2 bags salt pellets; peroxide purchase pending.
      • 2026-04-25: Family noted this as the relevant date for the 90-day/3-month follow-up reminder.

🚰 Drinking Water Filter — 4 Stage Residential RO

  • Discovered: 2026-07-13 from manual photo (Page 11 of 12 - 4 STAGE USER MANUAL)
  • Type: 4 Stage Reverse Osmosis Drinking Water System (under kitchen sink)
  • Flow: Cold water → Angle Stop Adaptor (HDFS-ASVA-14) → Sediment (SOC-25-1005) → Carbon Block (CB-25-1005) → Automatic Shut-off Valve (ASV-14QW) → Membrane Housing (MH03-1812WH) with Flow Restrictor FR-550QC → Post Carbon ICF-10Q → Tank RO-4S-W14 (4.5 gal white) + RO Faucet LF-LR-5TND → To Faucet / To Drain via Saddle DS-14QC
  • Manual Photo: attachments/ro_system_manual_page11_2026-07-13.jpg
  • Replacement Cycle:
    • Stage 1 Sediment + Stage 2 Carbon Block: every 6-12 months
    • Stage 4 Post Carbon (ICF-10Q): every 12 months / 2000 gal
    • Stage 3 Membrane 50 GPD (TW-1812-50): every 2-3 years
  • Last Service: (Pending - unknown, log when replaced)
  • Next Check Due: ASAP - check last change date, overdue if >12 months on Stage 1+2
  • Filters to Buy (exact part numbers from manual):
    • Stage 1: SOC-25-1005 — Hydronix NSF Sediment Filter 2.5" X 9.75" 5 micron — QTY 1
    • Stage 2: CB-25-1005 — Hydronix NSF Carbon Block Filter 2.5" X 9.75" 5 micron — QTY 1
    • Stage 3: TW-1812-50 — Hydronix NSF TFC 50 GPD Membrane Dry — QTY 1 (upgrade option: TW-1812-75 = 75 GPD, same housing)
    • Stage 4: ICF-10Q — Hydronix Inline Coconut Filter 2000 Gal, 2" x 10", 1/4" Quick Connect — QTY 1
  • Kit Search: SOC-25-1005 CB-25-1005 ICF-10Q TW-1812-50 — 4-pack kit ~$45-65 on Amazon
  • Compatible Generic Spec: 2.5"x9.75" 5mic sediment + 2.5"x9.75" 5mic carbon block + 2"x10" inline post QC + 1812-50 membrane
  • Hardware (do NOT replace routinely):
    • HF2-10WHWH14 Housing 10" white 1/4" QTY 2, RO-4S-W14 Tank 4.5G, LF-LR-5TND Faucet chrome, DS-14QC Drain saddle, ASV-14QW Auto shut-off, FM-60W Bracket triple, CLP-25W Clip 2.5" QTY 2, CLP-2520W Double clip QTY 2, MH03-1812WH Membrane Housing, FR-550QC Flow restrictor 550ml/min 90gpd, HDFS-ASVA-14 Angle stop adaptor, HDF-ASVA-14 Tube elbow, HDF-FE0602 Elbow QTY 2, HDF-FE0404 Check valve, HDF-BVTD0404 Tank ball valve

🔥 Boiler Filter

  • Last Service: (Pending)
  • Check Cycle: (Pending)

🏠 Guest House

  • AC Unit
    • Last Service: 2026-02-23 (Twin Cooling, Inc. fixed AC unit; invoice total $778)
    • Check Cycle: (Pending)
    • Service History:
      • 2026-02-23: Twin Cooling, Inc. service invoice for guest house AC at 220 Emerald Ave. Work description handwritten and partially unclear; invoice lists duct/refrigerant/tax and total $778. Company contact on invoice: 772-461-8736 / 561-727-5458. Communication number used: +1 (772) 240-3736.

🚗 Car Service

  • Corolla 2024
    • Last Service: (Pending)
    • Status: Scheduled (Scheduled by Adolfo on 2026-04-07)
  • Infinity QX60 2017
    • Last Service: 2026-04-15 (Oil Change & Rotation completed)
    • Status: Completed (Service finalized on 2026-04-15)

index | Maintenance Index